Lean Glossary and Tools

Here is a list of Lean tools that can be used to improve an organisation;

5S – Organising the workplace using 5 structured steps;

Sort – Eliminate that which is not neededSet – Organise the remaining items

Shine – Clean and inspect the area to an agreed standard

Standardise – Write standards for the above 3 steps

Sustain – Create an audit system to monitor the standards and look to continuously improve

Gemba – Spending time on the shop floor and go to where the action happens. This helps to gain a better understanding of what actually happens and engaging with the workers.

Hoshin Kanri – Policy deployment to align the goals of the company strategy with plans of the middle management and the workforce on the shop floor.

Jidoka – Design equipment to automatically stop when defects are detected to improve quality.

JIT (Just In Time) – Material is pulled through the production system based on customer demands at the right time, the right quality in the right quantities, reducing inventory levels.

Kaizen (continuous improvement) – Employees working together to proactively improve the processes in incremental steps.

KPIs (Key Performance Indicators) – Metrics designed to track and encourage progress towards the goals of the organisation.

OEE (Overall Equipment Effectiveness) – Measuring productivity loss for a manufacturing process through availability, performance and quality.

PDCA (Plan Do Check Act) – Used for implementing improvements

Plan – Establish a plan and expected results

Do – Implement

Check – Verify expected results achieved

Act – Review and assess (do it again)

Poka-Yoke (Error proofing) – Designing error detection and prevention into a process with the aim to achieve zero defects.

Root Cause Analysis – Problem-solving that focuses on the underlying problem rather than quick fixes that only treat the symptoms of a problem.

SMED (Single Minute Exchange of Dies) – Reducing the change over (set up) times to maximise a process run time by converting steps from internal (tasks performed while the machine is stopped) to external (performed while the machine is running).

Standardised Work – Documented procedures that capture best practices for a process that keeps waste to a minimal, safest way of working. This forms a baseline for improvements.

Takt Time – The pace of the production that aligns with customer demand. Available production time / Customer demand.

TPM (Total Productive Maintenance) – Focuses on proactive and preventative maintenance to maximise the operational time of the equipment.

VSM (Value Stream Mapping) – A tool used to visualise the flow of production/materials that helps to identify waste and improvements.

Visual Management – Visual displays of indicators and controls to improve the communication of information.

Related articles

Whitepaper: 6 key steps to achieving more with less

We’ve been lucky enough to work with many project teams over the last 12 months, helping them to navigate through the current challenging climate. What we’ve found is that most teams are consistently facing challenges within 4 key areas – all of which have been amplified by the current situation:

  • Resource Availability
  • Material Availability
  • Site Logistics
  • Plant and equipment

Do these areas sound familiar?

Ultimately, limitations due to the current climate mean teams need to achieve more with less. It’s going to be some time before we see a change in the current environment and therefore, we need to plan and organise ourselves for the new way of working.

Download our “6 steps to achieving more with less” to help mitigate against these challenging circumstances and allow your team to continue to deliver programs on-time and to a high standard.

Related articles

Rapid-Vac: How we helped one hospital trust maximise vaccination rates

The UK has been the world-leader in approving vaccinations for emergency usage and rapid deployment, as the biggest immunisation programme we’ve ever seen begins to roll out across the UK. Accelerating this programme to vaccinate the entire UK population is drastically needed to beat the pandemic and see a return to normality.

news-images

The vaccination plan and timetable published by the NHS and the Department for Health and Social Care outlines the scale of the ambition and the model which will be implemented to match that ambition. However, with ambition comes challenges.

A vaccination programme of this scale will require every resource available to be used effectively and efficiently if the program is to succeed. We know that vaccination production won’t be a limiting factor, however, a lack of skilled and trained resources to administer the injection in a safe and proper way for patients is soon to become a major constraint.

In this paper, we detail how using industry techniques with one hospital trust, we were able to increase the vaccinations per staff member by 153% improving injection numbers from 15.2 to 38.4 per staff member, whilst maintaining safety protocols and a positive patient experience – ultimately maximising ‘needle to skin’ time.

This model, described as Rapid-Vac, is currently in operation with the opportunity to be quickly and easily rolled out to further vaccination sites across the UK from village halls to GPs, to community centres, to mass vaccination centres.

Download our whitepaper for free to discover how the Rapid-Vac model can be quickly rolled out across to the UK to accelerate the COVID-19 vaccination programme by 153%.

Related articles

Let us help your business Go further.